How will the cryogenic cold storage installation take the first cooling

  In cold storage before put into production, low temperature cold storage installation debugging of the system is a very important content, only to cool the debugging to make cold storage temperature within the temperature down to your needs, to avoid warehouse civil engineering structure will appear because of sudden temperature is lower and destruction, together to learn about the library in the process of China refrigeration cooling for the first time in a do it.
  
  First of all we should do some preparation work for the refrigeration system is doing a very good job of pumping air into vacuum state, through a way of slow lead to a room temperature will gradually reduce, can then be evaluated for a cooling effect, why slow cooling is actually has some reasons, so can make the building engineering is contained inside slowly toward the external drainage, it also can avoid civil engineering because of lower temperature suddenly, water appears to freeze and destructive, or because you may be able to prevent because of the temperature drops too quickly and form the cold of a phenomenon, cause the outer walls of the civil engineering structure is affected, it is an important content in the process of low temperature cold storage installation.
  
  Cooling operation in low temperature cold storage prior to installation, even if we also should have corresponding knowledge, for example before filling refrigerant, be sure to do the operation of the vacuum, so to check whether system with strict, also can promote the air inside the cold storage and water discharge, before the heat preservation should also get nitrogen leak of the operation, it is also a good way to a processing, each kind of cold storage but choice of building materials are different, so we need to meet the cooling speed is also different, this is when we were in the low temperature cold storage installation must master a detail.
  
  Libraries of China refrigeration cooling for the first time when I was in the low temperature cold storage installation is such operation, the first step, make use of the differential to nitrogen inflator, the second step will be for evaporator line suitable for liquid, the third step will be through the slow cooling of an operation, the fourth step will speed of cooling operations, where you need to verify the cooling effect how, cold room general with the cooling effect is relatively good, in a limited amount of time we can find that evaporation temperature and the temperature of the warehouse to be able to quickly dropped to the normal range, and cooling speed can meet the requirements, the storehouse in natural temperature is normal also, at the same time, after slow cooling warehouse wall in general is relatively dry, there will be no cracks or deformation.
  
  Low temperature cold storage installation, if can be a cooling of debugging, the first time for civil engineering structure can also play a safeguard, in order to avoid because of lower temperature suddenly, makes the civil structure destruction of a case.
  • Previous:  2020/03/11
  • Next:What are the details of the refrigerator installation?  2017/05/03
  • 主站蜘蛛池模板: 91看片婬黄大片欧 | 成人午夜视频免 | 绿帽夫妻AV一级 | 国产脚交一区二区 | 国产视频福利导航 | 日本在线一区 | 日韩激情视频在线 | 激情婷婷| 成人导航在 | 成人福利免费视频 | 国产乱伦网站国 | 国产亚洲综合区成 | 国产免费怡红院视频 | 91精品国产综合久 | 天美麻花星空视 | 美日韩一区二区 | 福利二区 | 人人天天夜夜 | 午夜美女久大黄老师 | 午夜国产更新 | 精品一区二区三 | 欧美一级在线 | 成人国产一区二 | 最新国产精品拍自在线观看 | 国产粗语刺激 | 欧洲一级欧美一级a | 欧美一级日韩国产 | 精品在线中 | 国产不卡在线观看 | 国产乱子伦视频 | 狠狠热精品免费视频 | 国产精品一二三四区 | 国产美女裸网站 | 国产美女福利导航 | 看黄免费进入 | 国产精品爽爽v | 日本在线播放一区 | 欧美日韩国产亚洲 | 岛国大片网站 | 国产丝袜熟女91 | 日本三级欧美三级 |